bg

Planning - Addressing

To provide you with an address, you must be ready to permit the structure to be addressed with the Building Codes Office or have already made application with SCDHEC for your onsite septic (copy required).

If mailing, faxing or emailing your application, please include an aerial view or plat of your property with an X on the location of your building and an X where your driveway will be located.  You must also mark, on site, with orange or other highly visible markers, the location of the building site and the location of your driveway. 

Addressing staff will either conduct an on-site visit when assigning your address or your address will be assigned at your first building inspection.  We do NOT assign an address to vacant land. 

Processing time is 3-5 working days from application date.  There is no charge for submitting an address application.
bottom